Share on FacebookTweet about this on TwitterEmail this to someone
Share on FacebookTweet about this on TwitterEmail this to someone
Photo by Butch Moran
Photo by Butch Moran
The Verrazano-Narrows Bridge.

This Sunday, May 7, the Staten Island-bound lower level of the Verrazano-Narrows Bridge will be closed from 12:01 a.m. until 6 p.m. for the annual Five Boro Bike Tour.

Other closings at the bridge will include:

  • One Brooklyn-bound lane on the lower level from 8 a.m. to 6 p.m.
  • The Bay Street exit from 7 a.m. to 6 p.m.
  • BQE approach to the Verrazano Bridge from 9:30 a.m. to 6 p.m.
  • The 92nd Street entrance ramp to the Staten Island-bound lower level from 12:01 a.m. to 6 p.m.
  • The Belt Parkway entrance ramp to the Staten Island-bound lower level from 12:01 a.m. to 6 p.m.

The upper level of the bridge will remain open in both directions throughout the event, which is the largest charitable bike ride in the country, with proceeds funding Bike New York’s free bike education programs.

Comments:

Join The Discussion

x


Related Stories
Brooklyn pol unveils new anti-bullying bill “Danny’s Law” in memory of local teen
Brooklyn pol unveils new anti-bullying bill “Danny’s Law” in memory of local teen
Women rule the evening during annual Staten Island Power Women in Business event
Women rule the evening during annual Staten Island Power Women in Business event
Popular Stories
BROOKLYN MEDIA GROUP/file photo
A new sheriff in town: Dyker Heights residents start community watch
BROOKLYN MEDIA GROUP/ Photos by Jaime DeJesus
Sunset Park tenants hold rally after their landlord is ranked worst in city
BROOKLYN MEDIA GROUP/Photos by Arthur de Gaeta
Bay Ridge St. Patrick's Parade marshals named at annual meet-and-greet
Skip to toolbar