Hurricane Sandy Prep Tips From ConEd, MTA

FROM CON EDISON:

Con Edison is closely monitoring Hurricane Sandy and is preparing for possible damage in the company’s service area.

Forecasts show that tidal surges associated with this storm on Monday, and especially Tuesday, could be worse than Hurricane Irene’s last year.

All company personnel and field crews are preparing for high winds, heavy rains, and flooding conditions that could wallop electric, gas and steam systems when the storm moves into New York City and Westchester County.

Customers can report downed power lines, outages, and check service restoration status by computer or mobile device at www.conEd.com. They also can call 1-800-75-CONED (1-800-752-6633)When reporting an outage, it is helpful if customers have their Con Edison account number available, if possible, and report whether their neighbors also have lost power. Customers who report outages will be called by Con Edison with their estimated restoration times as they become available.

The company is advising its customers to pay close attention to reports from city and municipal officials. Con Edison will continue to provide updates through the media as the storm moves closer.

In addition, important information also will be posted on the company’s Web site, www.conEd.com.

For instructions on how to report an outage, click here: http://bcove.me/6sx1yox5

In the event the hurricane hits our area, Con Edison offers the following safety tips:

  • If you see downed electrical wires, do not go near them. Treat all downed wires as if they are live. Never attempt to move or touch them with any object. Be mindful that downed wires can be hidden from view by tree limbs, leaves or water.
  • Report all downed wires to Con Edison and your local police department immediately. If a power line falls on your car while you’re in it, stay inside the vehicle and wait for emergency personnel.
  • If your power goes out, turn off all lights and appliances to prevent overloaded circuits when power is restored.
  • Check to make sure your flashlights and any battery-operated radios are working.  Also, make sure you have a supply of extra batteries. Weather updates and news on power outages can be heard on most local radio and television stations.
  • Avoid opening your freezer to see if food is still frozen. Every time you open the door, room-temperature air enters and speeds the thawing process. Most fully loaded freezers will keep food frozen for approximately 36 to 48 hours; half-full freezers will keep food frozen for approximately 24 hours.

The company is in constant communication with the New York City Office of Emergency Management and the Westchester County Department of Emergency Services and company personnel are working closely with city and municipal emergency officials.

 

FROM THE MTA: 

The Metropolitan Transportation Authority (MTA) is monitoring the progress of Hurricane Sandy and taking necessary precautions to protect its transportation network. The storm is tracking toward New York and holds the potential for high winds and heavy rain that could make it unsafe to operate subway, bus and railroad lines, as well as to allow vehicles on the MTA’s seven bridges and two tunnels.

The MTA is working closely with the Governor’s office, the Mayor’s office and state and local Offices of Emergency Management to prepare for the storm and respond in a coordinated manner.

“Our first priority is always safety, and the MTA is taking no chances with the safety of our customers, our employees and our equipment,” said MTA Chairman and CEO Joseph J. Lhota. “We are hoping for the best but preparing for the worst. Whatever happens, we’ll be ready.”

The MTA Hurricane Plan calls for an orderly shutdown of service before the arrival of sustained winds of 39 mph or higher. No decision has been made whether to suspend some or all service in advance of the storm, but ample notice will be provided of any suspension. Customers and the media should monitor the mta.info website, which is updated continuously with service information as it becomes available. Customers can also call 511 for service information.

The MTA last suspended service during Tropical Storm Irene in August 2011, when it successfully helped people get to safety before the storm, then shut down its transportation network in an orderly manner to protect employees and equipment.

The Hurricane Plan also contains detailed protocols for New York City Transit, Metro-North Railroad, the Long Island Rail Road, Bridges and Tunnels and Capital Construction to prepare for the onset of a storm by moving equipment such as rail cars and buses from low-lying storage areas or vulnerable outdoor tracks; by staging recovery equipment such as generators and chainsaws near areas where they would be needed; by clearing catch basins and sewer lines; and by installing protective barriers to keep floodwaters out of buildings, tunnels and storage yards.

Details of each agency’s storm planning are provided below.

NYC Transit:

  • Most scheduled weekend subway service changes for construction projects have been cancelled, with the exception of changes planned for the 7 and J lines, which are now scheduled through Saturday only. Crews are inspecting and clearing main drains and pump rooms throughout the subway system. Personnel are checking and cleaning all known flood-prone locations and these areas will continue to be monitored.
  • Extra workers and managers are prepared to staff New York City Transit’s Incident Command Center, situation room, satellite desks, depot operations and facility operations as necessary. The Incident Command Center will be activated starting at 8 a.m. Sunday. Among those present in the ICC throughout the duration of the storm will be Customer Advocates, who will ensure that all decisions made during the event will reflect a focus on customers. They fill a position created after reviews of the agency’s performance during Tropical Storm Irene.
  • Trains will be removed from outdoor yards prone to flooding and moved to more secure locations. Subway ventilation grates vulnerable to flooding will be sandbagged and tarped over. Many station entrances and ventilation grates in low-lying areas have been successfully modified in recent years to raise them above street level, making it more difficult for floodwaters to enter the system.
  • All portable pumps and emergency response vehicles will be checked, fueled and made ready for service. Outside contractors have been asked to prepare their work sites for heavy weather.
  • Bus operators are ready to move buses that normally park in low-lying depots to areas of higher ground.

Metro-North Railroad

  • Metro-North personnel are stockpiling material in preparation for possible washouts or bank erosion, and are securing road crossing gates when necessary.
  • Much of Metro-North’s territory runs along rivers and the Long Island Sound With nearly 800 miles of tracks to take care of, Maintenance of Way workers have already begun preparing for Sandy at known trouble spots.
  • Culverts are being cleared of fallen limbs and other debris. Ditches and swales are being cleaned out. Pumps are being tuned up and put in place at known low spots such as New Haven Yard and Mott Haven Yard, while generators at all rail yards are being fueled and tested.
  • Cranes and excavators and back hoes are being positioned along the tracks, and a tree service contractor is on call to respond rapidly if needed.

Long Island Rail Road:

  • Long Island Rail Road is preparing facilities and infrastructure by clearing drains, securing work sites against possible high winds, fueling equipment, stocking supplies and making plans to move equipment and supplies away from low-lying areas. Chain saws, generators and pumps are ready for use as well.
  • The LIRR’s scheduled track work this weekend for the replacement of concrete ties between Jamaica and Queens Village, and the resulting bus service for Queens Village and Hollis customers, is now scheduled to end at 11:59 PM Saturday evening.
  • Extra personnel will be assigned to report for duty before the storm is forecasted to make landfall on Long Island.
  • Crews will be prepared to remove crossing gates from LIRR crossings in advance of the storm if necessary, to protect them from high winds and assist in a quicker recovery. Service must be suspended if crossing gates are removed.

Bridges and Tunnels

  • All roadway and drainage systems at Bridges and Tunnels facilities are being checked and cleared of debris. Construction areas will be secured, backup generators are in place, and wrecker trucks and other response vehicles are readied to help motorists who may become stranded. In addition, staffing levels were checked and emergency personnel have been put on standby.
  • Motorists are advised to reduce speeds when winds are between 40 and 49 mph in dry conditions, and 30 to 49 mph in windy and wet conditions.
  • When the winds are 50 mph or more in dry or wet conditions, certain vehicles will be barred from using MTA crossings. These include motorcycles, tractor trailers, step vans, mini buses, trucks with open backs, cars pulling trailers, motor homes and vehicles carrying plate glass.
  • If there are sustained winds of 60 mph or above, the MTA may close one or more bridges to all traffic.

Capital Construction

  • All contractors at Capital Construction projects – East Side Access, the Second Avenue Subway, the 7 Line Extension and Fulton Center – will secure all materials and equipment, including cranes, to prepare for high winds and flooding.

Leave a Reply

You must be logged in to post a comment.