Due to weather, planned closures at the Robert F. Kennedy Bridge’s Harlem River Lift Span and Hugh L Carey Tunnel have been cancelled, according to the MTA.
Before the cancellation, the RFK Bridge was scheduled for closures in both directions on Monday, January 26 between 12:01 a.m. and 5 a.m. while one tube at the Hugh L Carey was slated to be closed on Saturday, January 24 between 4 a.m. and 12 p.m. for maintenance work.